..main task for November. These socks were hard to create, not the pattern, but the thick needles. I was glad, when I finally finished them. I only have to sew an elastic inside the cuff in order to hold them in place.
Knitting time: 02.11.08 - 17.11.08
Material: 150 g Schachenmayr Boston with dpn 7.0
Knitting time: 02.11.08 - 17.11.08
Material: 150 g Schachenmayr Boston with dpn 7.0
No comments:
Post a Comment